![]() |
||
![]() |
![]() |
![]() |
![]() |
Step by Step - Carpentry- When the timber arrives, the stacks are moved into the workshop and the members laid out ready to be marked up. - Once each element of frame is marked, the joints can be cut. - The joints will now be fitted together and the frame elements assembled. The peg holes will be marked, and carpentry marks carved into the timber faces. - Once the framing sequences are complete, the frame is stacked ready to be loaded on the lorry |
![]() |
![]() |
![]() |
![]() |
Designed by Fire and Ice Creative | Coded by dbimedia |
||